Irving (Dallas County) electrical permits: a homesteaded homeowner can pull one

Verified against the city’s published rules · page updated October 23, 2026 · rules change — confirm with the city before applying

In Irving (Dallas County), new electrical wiring needs a city permit. A contractor must hold the state license and register with the city before it can get one. A homeowner can get the permit and do the work on a home they live in, once a homestead exemption is on file with the Dallas Central Appraisal District. Everything below is from the city’s code, fee schedules, forms and council records, with dates, plus the Texas Occupations Code.

Who issues the permit

The City of Irving Inspections Department issues electrical permits for work inside the city limits, through its online portal.

The department is at City Hall, 825 W. Irving Blvd., 2nd Floor, Irving, TX 75060, open Monday to Friday, 8 a.m. to 5 p.m. Its number is 972-721-2371 and its email is irving-permits@irvingtx.gov, as printed on the city’s Inspections pages. Its Building Inspections Division covers building, electrical, mechanical, plumbing and irrigation inspections.

Permits run through My Government Online (MGO), the city’s portal at mgoconnect.org. Contractors must apply there. The city’s residential brochure says homeowners may also apply by email.

Irving sits entirely in Dallas County, according to the Census Bureau’s 2025 estimates.

The state electrical licensing law, Chapter 1305 of the Texas Occupations Code, gives counties no electrical permitting role and does not mention them. Section 1305.201(d) says electrical work inside a city’s limits “must be installed in accordance with all applicable local ordinances,” and §1305.201(e) says work in an unincorporated area must meet standards “at least as stringent as the requirements of the state electrical code.” This page covers addresses inside the city limits of Irving (Dallas County) only.

The rules are in Chapter 8B of Irving’s Land Development Code. Section 8B-21 adopts the 2023 edition of the National Electrical Code “as the electrical code of the City of Irving,” with local amendments, last changed by an ordinance adopted March 21, 2024. On March 26, 2026, City Council adopted the 2024 International Codes and rewrote the permit and registration section, Ordinance 2026-11253, which by its own terms took effect May 1, 2026. The Inspections pages still link that ordinance under the word “Proposed.”

When you need one

New electrical wiring needs a permit. Replacing a fixture or appliance at an existing connection does not.

Irving’s Residential Guidelines say building permits are required to “erect, enlarge, alter, move, demolish or repair a structure in the City of Irving.” The city’s residential brochure lists “New electrical wiring” among the jobs that need one, and its Fees + Forms page lists Single Trade Permits for electrical work.

The same Residential Guidelines page draws the exempt side in one sentence: “Permits are not required for cosmetic work such as painting, carpeting and cabinetry, nor is it required for replacing fixtures or appliances, except water heaters, at existing connections.” Swapping a light fixture on the same box is on the exempt side. A new circuit or a moved outlet is new wiring and is not. Service changes have their own fee line, below.

Electrical permits need no drawings. The Residential Guidelines list electrical among the permits that “do not need any plans.”

Starting without a permit adds a second fee. Section 8B-27 adds “an investigation fee equal to the fee included in the permit fee schedule” for anyone who starts electrical work before getting the permit, on top of the regular fee.

Can a homeowner pull it?

Yes. Irving lets a homeowner get the permit and do the work, on a home they live in with a homestead exemption filed with the Dallas Central Appraisal District before applying.

Section 8B-27 reads: “Homeowners may obtain permits to perform work at a residence for which they have a homestead tax exemption and in which they live without being registered and without the requirement of hiring a registered contractor.”

The Residential Guidelines set the timing: “If the homeowner is planning to do the work themselves, the homeowner must have a homestead exemption filed with the Dallas Central Appraisal District before applying for a residential permit, except roof permits.” If you bought the house recently, check that your exemption is on file before you apply.

The Inspections FAQ puts it this way: “Homesteaded residents (through the Dallas Central Appraisal District) do not have to be licensed to perform work on their own home, in most cases.” The city does not say which cases are excluded. We found no Irving text that bars homeowners from service or meter work, requires an exam or affidavit, or says the owner must do every part of the job personally. Ask before you plan service work.

State law exempts an owner who lives in the dwelling only for work “not specifically regulated by a municipal ordinance” (Tex. Occ. Code §1305.003(a)(6)). Irving’s ordinance regulates this work, which is why the city’s permit and its conditions apply.

The city also warns against pulling a permit for someone else. “Do not take out a building permit for any contractor.” The FAQ explains: “If you sign for the permit, you are liable for correcting the contractor’s work if it does not meet city-adopted code standards.”

Hiring an electrician: state license and city registration

A contractor needs a TDLR Electrical Contractor license and a current registration with the City of Irving.

Texas requires a license from the Texas Department of Licensing and Regulation (TDLR) to perform or offer electrical work (§1305.151). TDLR says a business “must employ a licensed Master Electrician to apply for an Electrical Contractor license.” Check any name on TDLR’s license search, or read how to look up a Texas electrical license.

Irving adds registration. Under §8B-27, electrical contractors “are required to register with the city in order to secure a permit as provided for in this code.” Registration is made in writing or through the online portal, and it “shall expire one year following the date of its issuance.” The Fees + Forms page lists Contractor Registration as an MGO application: “Required to register as a contractor, such as: electrical, mechanical, plumbing, irrigation, sign, fence, general contractor, etc.” The Inspections FAQ adds that “the city verifies applicable contractor licensing with the State of Texas for all building permit applications.”

An electrician joining a permit someone else holds is added by email, not through the portal, and the city says: “There is no fee to validate.”

Texas Occupations Code §1305.201(f) reads: “A municipality or region may not collect a permit fee, registration fee, administrative fee, or any other fee from an electrician who holds a license issued under this chapter for work performed in the municipality or region. This subsection does not prohibit a municipality or region from collecting a building permit fee.” None of Irving’s three posted fee schedules prints a contractor registration fee. The city does charge the permit fees below, and this page does not decide how they fit the statute.

Find TDLR-licensed electrical contractors filed in Dallas County. See the other Texas city electrical permit guides.

Fees

Irving prints one $65 electrical permit line, for service changes, temporary poles and utility releases, and no line for a new circuit, a panel replacement on its own or an EV charger.

Section 8B-27 says permit fees are set by City Council resolution. The FY26 schedule linked from the city’s Rates + Fees page has an Inspections section effective February 13, 2026. These are the lines that touch residential electrical work, as the city prints them:

  • Electrical single trade, covering temporary service poles, mobile home service, utility releases, clean and shows, and service changes: $65 (each multi-family unit is a separate permit)
  • Re-inspections: $75
  • After-hours inspection: $65 per hour, two-hour minimum, $130 minimum
  • Solar energy system: $75 plus $55 per hour for plan review; permit minimum $130
  • Investigation fee for work begun without a permit: 100% of the regular fee, in addition to it

The FY27 schedule prints the same lines with an Inspections section dated November 1, 2026. The Fees + Forms page still links an older schedule, dated October 15, 2022, which prints the same figures too.

The schedule has no line for a new circuit, a panel replacement on its own, an EV charger or a generator. For work not listed, §8B-27 says “a fee shall be charged based upon a category of work shown which most nearly resembles the work intended.” That makes the price of a new circuit or a panel swap the city’s call, and we give no total. Call Inspections at 972-721-2371 for the fee on your job.

Inspections

Your permit includes its inspections, and you request each one in MGO by 6 a.m. on the day you want it.

The residential brochure says “Your permit includes all the associated inspections.” The Building Inspections page says that through MGO “the cut-off time is 6 a.m. the day of the inspection,” and that later requests go to the next business day. Results show in MGO, and there is an MGO Connect phone app.

A failed inspection costs $75 to re-inspect. The Inspections FAQ says “Typically permits expire if work authorized is not started and inspected 180 days after issuance.”

Common homeowner jobs

Panel and service work carries Irving’s local code changes, and generators, solar and batteries have their own permit path.

  • Panel or service change. Service changes are on the $65 line. Irving amended the 2023 code’s outside emergency disconnect rule (NEC 230.85(C)) so it does not apply where an existing installation that complies with NEC 230.70(A) has only its meter socket, service-entrance conductors or related raceways and fittings replaced. Irving also added NEC 220.6: “A load calculation shall be provided upon request when modifications to the electrical installation occur.”
  • Standby generator. The Fees + Forms page lists a Generator permit, “Required when adding a permanent generator.” Irving’s code amendment places a residential stationary generator “a minimum of three (3) feet from a property line, a minimum of five (5) feet from openings,” or farther if the listing or manufacturer requires it. The fee schedule has no generator line.
  • Solar and batteries. Contractors can use SolarAPP+ or another third-party review for residential systems up to 38 kW, then apply in MGO. The city’s procedure sheet (PDF created August 2025) sets a $130 minimum permit fee and, for third-party submissions, issues the permit within three business days of notice. Irving’s code amendment to NEC 705.8 requires a TDLR-licensed master or journeyman electrician on site while a grid-connected system is installed.
  • EV charger. The third-party path excludes “Electric Vehicle (EV) charging systems,” and the fee schedule has no EV line. We found no other city page on EV chargers.

What this page does not claim

We report what the city and state texts say, and we did not confirm anything with the city by phone.

We do not state what a new circuit, a panel replacement on its own or an EV charger costs, or give a permit total. We do not say whether the homeowner permit covers service or meter work, or which cases the city’s “in most cases” leaves out. We did not open the registration form inside MGO, so we do not say what registration costs, only that the fee schedules list nothing for it.

License and permit information from the City of Irving and the Texas Department of Licensing and Regulation, read October 9, 2026. Neither this site nor the information as presented here is endorsed by the State of Texas or any state agency.

Sources, and when we read them

Every figure on this page comes from one of the documents below, each published by the body that sets, measures or administers the thing it describes. We record the document’s own date and the date we read it, because published pages change without notice.

SourceDocument dateWe read it
City of Irving Land Development Code, Chapter 8B, Building Codes (§8B-21 National Electrical Code; §8B-27 Permits; fees; registration), eCode360§8B-21 last amended by Ordinance 2024-10884, adopted March 21, 2024; §8B-27 as rewritten by Ordinance 2026-11253, adopted March 26, 2026. Code version 2026-08-27, which states it includes legislation through Ord. No. 2026-11315 adopted August 27, 2026 (re-read 2026-10-09 by the fact gate; the drafter’s ‘through July 30, 2026’ was stale)2026-10-09
City of Irving, 2023 National Electrical Code Amendments (Attachment 7 to Chapter 8B), eCode360pages marked ‘Publication, Feb 2025’2026-10-09 (read as PDF text)
City of Irving, ordinance adopting the 2024 International Codes and rewriting Chapter 8B (posted text)posted March 2026 with the notice of the March 26, 2026 public hearing; Section 5: takes effect May 1, 20262026-10-09 (read as PDF text)
City of Irving, Ordinance No. 2026-11253 as passed (amending Chapter 8B to adopt the 2024 I-Codes), filed with the codifier; eCode360 Law Ledger‘PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF IRVING, TEXAS, on March 26, 2026’; Section 5: ‘This ordinance shall take effect on May 1, 2026’; PDF created March 30, 2026; 53 pages; signature lines blank in this copy (no signature images in the file). Law Ledger lists it ‘Ordinance 2026-11253 … 2026-03-26 Amends Chapter 8B: Building Codes’2026-10-09 (read as PDF text by the fact gate)
City of Irving City Council, minutes of April 16, 2026 (consent items 2 and 3, approving the minutes of March 26, 2026)April 16, 2026; the March 26, 2026 minutes themselves are not posted on the city’s agendas page2026-10-09 (read as PDF text by the fact gate)
City of Irving City Council, Long Agenda, March 26, 2026 (item 25, Chapter 8B Building Codes)March 26, 2026; states ‘The effective date for this ordinance is May 1, 2026.’2026-10-09 (read as PDF text)
City of Irving, Residential Guidelinesundated city web page2026-10-09
City of Irving, Inspections (department page and FAQs)undated city web page2026-10-09
City of Irving, Building Inspectionsundated city web page2026-10-09
City of Irving, Fees + Formsundated city web page; its ‘Permit Fees’ heading links the FY24-25 schedule PDF, and the sentence under it (‘Permit Fee schedule for permit applications filed with the Inspections Department. Revised Oct. 15, 2022.’) links the Rates + Fees page, which carries the FY26 and FY27 schedules2026-10-09
City of Irving, Schedule of Fees, February 2026 Amendments (Inspections section, items 11, 13, 26, 37 and 41)Inspections section headed ‘EFFECTIVE FEBRUARY 13, 2026’; linked from the city’s Rates + Fees page as the FY26 Consolidated Fee Schedule2026-10-09 (read as PDF text)
City of Irving, Schedule of Fees, FY26-27 Amendments (Inspections section, items 11, 13, 26, 37 and 41)cover ‘Effective Oct. 1, 2026’; Inspections section headed ‘EFFECTIVE NOVEMBER 1, 2026’; linked from the city’s Rates + Fees page as the FY27 Consolidated Fee Schedule2026-10-09 (read as PDF text)
City of Irving, Consolidated Fee Schedule FY24-25 (Inspections section)Inspections section headed ‘EFFECTIVE OCTOBER 15, 2022’; the document the Fees + Forms page links2026-10-09 (read as PDF text)
City of Irving Inspections Department, Residential Permits brochureundated; PDF created April 20252026-10-09 (read as PDF text)
City of Irving Inspections Department, My Government Online (MGO) Instructionsundated; PDF created April 20252026-10-09 (read as PDF text)
City of Irving, Third-Party Backup Power page and its Standard Operating Procedure, Home Backup Power Installationsundated city web page; the procedure PDF was created August 20252026-10-09
U.S. Census Bureau, Vintage 2025 subcounty population estimates, Texas (Irving city rows)July 1, 2025 estimates (Vintage 2025)2026-10-09
Texas Occupations Code ch. 1305 (§§1305.003(a)(6), 1305.151, 1305.201), official text, Texas Legislaturecurrent text; §1305.201 last amended by Acts 2017, 85th Leg., R.S., Ch. 285 (H.B. 3329), eff. September 1, 2017; chapter contains no reference to counties. Raw text read from the Legislature’s resource file behind that page (tcss.legis.texas.gov/resources/OC/htm/OC.1305.htm)2026-10-09
TDLR, Apply for a New Electrical Contractor License (master electrician of record); TDLR License Searchundated agency web page2026-10-09
Authorities

Where to apply for an Irving electrical permit.

City of Irving Building Inspections

825 W. Irving Blvd., 2nd Floor Irving 75060
972-721-2371
Official electrical permit information ↗

Before you start

Electrical permits are issued by the city, not the county, so what is on this page applies inside this jurisdiction and nowhere else — an adjacent city's answer is not this one's. Confirm with the department before work starts.

Hire an electrician in Dallas County.

The license-verified electricians on our Dallas County page are each matched to TDLR records, with phone numbers and license status.

Find Dallas County electricians
Free electrician quotes

Get free quotes from verified Dallas County electricians.

Tell us the job once — we send it to up to 3 license-verified electricians. Free, no spam, delete your request anytime.

Electrical Quote Request

Secure form. Sent over an encrypted connection to up to 3 license-verified electricians. Never sold to data brokers, and you can have your request deleted anytime.